FRP Cooling Tower Fill Closed Cooling Tower Filler
Payment Type: | L/C,T/T,D/P,Paypal,Money Gram,Western Union |
---|---|
Incoterm: | FOB,CFR,CIF,FCA,CPT |
Min. Order: | 500 Piece/Pieces |
Delivery Time: | 7 Days |
Packaging: | Pallet |
---|---|
Productivity: | 900000pcs/month |
Brand: | Long Zhuo |
Transportation: | Ocean,Land,Air,Express |
Place of Origin: | China |
Supply Ability: | 900000pcs/month |
Certificate: | ISO |
HS Code: | 3926909090 |
Port: | Shanghai,Tianjin,Xiamen |
Basic Info
Model No.: CTF
Product Description
Cross Flow 750mm Cooling Tower Filling
Cooling tower fill is made of rigid PVC or PP film of flame retardant quality with high heat exchange efficiency.
The high efficiency fill reduces the motor input HP and assures uniform distribution of water, with minimum resistance to air flow.
Cooling Tower Fill Specifications
Type | CF750-KU |
Material | PP/PVC |
Width | 730m, 750mm, 950mm, 980mm |
Length | As your request |
Thickness | From 0.28mm to 0.38mm |
Sheet Space | 19mm |
Application | Used in Cross Flow Cooling Tower |
Cooling Tower Fill Advantage
1. Good Chemical and Physical Performance.
2. Good anti-flaming performance.
3. High strength of assembly.
Cooling Tower Fill Packing
Pallet, wooden box, naked packing with carton
1. We can glue the cooling tower fill pieces in block and load in container, which requires more space and cost more freight.
2. Send the pieces without gluing together, which will save much more freight. And the video of how to glue the pieces will be sent too.
FAQ
Q: Are you trading company or manufacturer?
A: We are factory in China.
Q: How long is your delivery time?
A: Generally it is 5-7 days if the goods are in stock. or it is 7-15 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment?
A: T/T, Paypal, Western Union, Visa, E-checking, etc.
Related Products:
Cooling Tower Parts:cooling tower fill,cooling tower spray nozzle,cooling tower air inlet louver,cooling tower drift eliminator.
Water Treatment:tube settler,Water Tank,bio ball filter media,fine bubble diffuser.
Product Categories : Cooling Tower Parts > Cooling Tower Fill